'House' Category Archives
2013th March. 25th | House
House of Donatus
Pecs on the following housing plan. The floor plan developed relatively early, however, the weight of the building has gone through many variations. The fruition is not here, just the like are to be installed. The clients turn to us for now evident, for example. the walls padlásfödémek ... More
2012th January. 9 | House
Instead Land House chalet
The following plot is made of a hill house plan, but because of the local building regulations and administrative barriers have been some uncertainty when they are given planning permission, so they decided to change the direction of a prefabricated house wooden beams. Sajtszósz 2011 .... Read more
2011th December. 12th | House
Pre-qualified passive house Fótligeten
I have repeatedly featured in this house, the first time when it was being planned. Meanwhile completed as planned, administered pre-qualified, the soon to be adopted. I was invited to the house plans for passive houses and energy-efficient buildings conference. The presented there ... More
2011th November. 7 | House
House almost ravine
The title is a slight exaggeration, of course, be precise: Telekom very steep. A land if you first consult my opinion, most definitely would have talked to them to build a. In such a plot építkezésből difficult to get along with. We can say also that any additional costs ... Read more
2011th October. 17th | House
A passive house does not Pécsvárad
2009 Pécsváradi made the following plan and is "not a passive house ..." the show title, it was originally intended to build the roof. I'll explain. He had the determination, almost at any cost, it's not possible is because the envisioned functional layout ... more
2011th September. 26th | House
Nearly circular house Bodajk
Bodajk, bakonyi this small settlement on the following page. The builder was initially part of a single-storey circular building, possibly used for flat roofs, passive design house nearby. The circular shape had a very rational (but not be discussed here) the reason .... Read more
2011th May. 12th | House
Working Cross | Church Hill Kővágószőlős
Importance real challenging work, hill house design with a 10% gradient hill side, next to the strict standards that are so severe that you can not (do not) build. The area is classified as agricultural land, but under certain conditions can be allowed house. Let's start with ... Read more
2011th March. 31, | House
Intergovernmental Working | Bp house nearby residential park
Under design passive house (close) family house in a gated community near Budapest. Originally a flat roof, next door to dense forest, sun exposure mostly from above, the orientation is toward a good neighbor, so (clad in sheet metal) sloping roof, skylights. Yeah .. more
2010th September. 20th | House
Flat roof villa Sátoraljaújhely
An earlier my house I have already written that rare occasion when an architect can work with complete freedom. The client contacted me with a number of flat-roofed houses seen on my website, which is very liked it. He also wants to build Sátoraljaújhely a fairly steep a house like this ... Read more
2010th April. 16th | House
House Zamárdiban
Zamárdiban, very close to the lake, a newly parceled up the building complex would be built just for display. Large and spacious family house of the said order. On the rare unfortunate situation was that I was completely free hand part, and partly because of the ... More
2009th December. 29th | House
Dear Nicholas!
Dear Nicholas! The house is built, the heating has been going on, and you are almost "only" behind the inner work. We are glad that you designed the house, love it and look forward to occupying. We wish you and your family a Merry Christmas and a Happy New Year! Sincerely, ... Read more
2009th November. 23, | House
Where there are no parallel rafters
Rare beautiful moments an architect, real freedom when you get to the building shaping, no previews, "ideas", one goal is to be beautiful (and of course meet the needs of the principal). At the house when it happened, and I confess I drew the building ... More
2009th November. 10th | House
Swiss chalet
Fortunately, this is a profession, which sometimes occur in non-standard orders as well. The antecedents enough to work in Hungary, a Swiss-owned furniture factory, which exports mainly within that Switzerland and Germany only deliver furniture, ... More
2009th October. 30th | House
I really want to renovate, whatever the cost?
Situations arise, not to mention that the front and vain think to be futile, unnecessary, and propose a solution to be found, even used, the proposal must be feasible. The 'whatever it takes, but we must live with "compulsion, a necessity as the front ... More
2009th July. 20th | House
House Cinkotára
The Budapest Cinkotára planned this single-family house. The only access road easement, gently sloping plot of the panorama aligned positioning of the building. Garage was not only protected by a pergola parking. The ground floor master bedroom at the request of the builders ... Read more
2009th March. 9 | House
You (Plan) criticism 25 | raping a house
Probably too many of us are inclined to believe (because it flatters the vanity) when they tell us that we do everything we can do. Of course, this is not the case and there's a good chance that the fuser. Below is the result of a bad plan design here .... Read more
2009th January. 29th | House
House of the Mecsek
The edge of the city, the foot of the Mecsek designed this house. The site features was that half of them were completely flat, and the other half is steep terraced slope. Another important capability to the street through a narrow valley, so that the late afternoon sun only ... Read more
Of 2008. November. 28th | House
Prefabricated houses | chalets first it was once a cement bonded
The domestic light timber framed history of the so-called. Erdért and Czech wooden houses started, but they are only 6-8 cm thick falszerkezeteikkel up were eligible for holiday purposes. The West Hungary, Szombathely, Sopron Timber Industry Combine factory (formerly FORFA) was first ... Read more
Of 2008. October. 13th | House
Pergola over patio
A neighbor friends on the patio and pergola in this tapestry. Built toward the neighbors to put a gap separating walls were covered in wood paneling, shelves which were too sparse or a small-sided cabinet that contains tools for garden watering ... More
Of 2008. September. 30th | House
Family house | Pécs, Nagyszkókói road
Strong sloping land is above the house, so before I even made a feature also waited for geodetic survey and megmodelleztük the first stage (shown at the bottom of the left-foot contours). The morphology of the terrain around who is nominated ... Read more















